Project and Client Examples |
Energy & Power Audits & Testing
| Universal Studios,
Orlando, FL |
|
Investigated and analyzed power quality issues with several rides throughout
the park. ET ride with harmonic problems with VFD's. Kong ride with voltage
stability and harmonics problems with VFD's. Dr. Seuss ride with audio
interference problems. Recorded multiple circuits on electrical feeds, drives,
and motor. Loads to verify recommendations for corrective action to improve
reliability and maintainability. |
|
| Nielson Media
Center, Tampa, FL |
|
Performed the acceptance testing of a new multi-million dollar data center
(Tier III). The system consisted of Quad redundant power distribution system
and dynamic switches for eight Powerware 750 KW UPS. We used twenty-six Dranetz
4300's to record power quality, transient response, and harmonics of the entire
data center UPS electrical system and back-up generator emergency power
system. |
|
| Sarasota Hospital
Load Profiles for American Healthcare Agency |
|
PQ
Testing set 47 Elite Pro power loggers to record voltage, current, kW, kVA,
kVAR, and power factor for thirty-day load study for government requirements to
add load. We have over 70 loggers to monitor load profiles
simultaneously. |
|
| Florida Hospital,
Altamonte Springs, FL |
|
Investigated electrical grounding and bonding of the security system for the
hospital. Performed two point and three point ground measurements as well as
the lightning protection system. Made recommendations to correct identified
deficiencies. Suggested surge suppression for trouble areas of sensitive
camera computers and their network components. |
|
| Four Seasons
Resort, Nieves Island, Caribbean |
|
Investigated utility billing disputes. Metered the utility feeder and resort
subsystems proving the utility metering was incorrect resulting in revenue
savings. Tested all motors and transformers per IEEE specifications. All motors
and transformers were found to be in specification. Preventative maintenance
infrared inspection identified several hardware failures to be
repaired. |
|
| Channel
Partner |
|
Ring Power - Generator Acceptance Testing Power Ware - UPS Acceptance
Testing Square D - Harmonic VFD Acceptance Testing Winter Park Utility
- All Power Quality Investigations Lee County Utility All Power Quality
Investigations |
|
| Other Clients
Include: |
|
NASA, Florida Power, FP&L, TECO, Winter Park Utility, Disney, , Harley
Davidson, AT&T, Universal Studios, Ocala Electric, JEA, GRU, OUC, Florida
Hospitals, Verizon Wireless, Motorola, Kennedy Space Center, Mac Dill AFB,
Square D, ABB, Ring Power, PowerWare UPS, and many others. |
|
|
|
| Universal Studios |
| Investigated and analyzed power quality
issues... |
| Nielson Media Center |
| Performed the acceptance testing of a new multi-million dollar data
center. The
system... |
| Sarasota Hospital |
| For government requirements, 47 power loggers recording voltage,
current, kW, kVA, kVAR, and power factor for thirty-day load
study... |
| Four Seasons Resort |
| Metered the utility feeder and resort subsystems p resulting in
revenue
savings... |
| Channel Partner |
Ring Power - Generator Acceptance Testing. Power Ware - UPS Acceptance Testing.
Square D - Harmonic VFD Acceptance
testing...
More examples... |
|
|